2 responses to “Street resurfacing work underway”

  1. The crews doing the work have been in my neighborhood for the past few weeks. It is a huge job but they have done it with minimum disruption and always left the street in a very cleaned up condition. I think we get the last part done tomorrow. It will be nice to have or “new” street. It is great to see our community being maintained in great condition.

  2. The contractor has posted all the streets in our neighborhood with no parking signs. In order to not have my wife’s vehicle “trapped” in our driveway, we had to look for a spot that was not posted. The only spot is several blocks away. She is handicapped and cannot walk up hills or for long distances. I think the contractor was not considerate of this situation when he posted the entire tract.